WANG PAI PRECISION / QUALITY CONTROL

Quality begins
with the requirement.

Material, critical dimensions, surface condition and inspection criteria defined together.

PRECISION MANUFACTURING

Know what to measure.
Agree what to accept.

A clear component drawing connects the production route with its quality requirements.

Define the material standard, critical characteristics, dimensional tolerances and required records at the start of the project. Identify features that need specific inspection or functional tests.

For cast and machined parts, review the datum strategy, machining allowances and finish requirements together.

Discuss inspection requirements

PROJECT REVIEW

Four points to define.

  1. Material specification and drawing revision
  2. Critical dimensions and functional interfaces
  3. Surface finish and acceptance criteria
  4. Sample approval and release records

FROM SAMPLE TO DELIVERY

A clear basis
for acceptance.

01

Before production

Confirm the drawing, material, process assumptions and sample requirements.

02

During manufacture

Review cast geometry, machined features and the agreed surface condition.

03

Before delivery

Verify the agreed checks, records, identification and packaging.

YOUR NEXT COMPONENT STARTS HERE

From your drawing.
To a finished die casting.

Tell us about your material, geometry and project requirements.

Send your inquiry

Necessary storage supports secure forms, website sessions and your privacy choice. Optional analytics helps Aluminum & Zinc Die Casting understand visits, page use and enquiry interactions. Website Analytics is enabled by default. Uncheck it and save your preferences to stop analytics.

Your choice is saved for 180 days. We ask again when it expires or these settings change.

Necessary

Always active

These cookies keep the website and enquiry forms working securely and remember your privacy choice. They also support administrator authentication.

Cookies and browser storage

Necessary: zdcs-session and XSRF-TOKEN cookies support sessions and form security and last for 2 hours, renewed by website activity. The zdcs:consent local storage record remembers this privacy choice until its expiry. Optional analytics: zdcs:analytics:visitor uses local storage; zdcs:analytics:session and zdcs:analytics:last-activity use session storage. A new analytics session begins after 30 minutes of inactivity. These identifiers are removed when analytics is declined, consent expires or the consent version changes. Session storage normally ends with the browser tab; browser settings can also clear site data.

Cookie Policy